I can still remember the morning I stood in my friend Sarah's gutted kitchen, watching her contractor try to explain after finding knob-and-tube wiring behind what was supposed to be a simple cabinet installation. Sarah was already over her renovation budget beyond recognition and then found out about this. "Nobody told me this stuff," she said, as tears filled her eyes with frustration.
That moment crystallized something I had been thinking about for a few months. After years of helping friends through renovations, writing about home improvement, and watching so many renovations go awry, I couldn't help realize that most homeowners embark on whole-house renovations completely unprepared. They get fixated on the fun stuff, like paint colors, light fixtures, and finishes, and leave themselves unprepared for the ugly realities that can make or break the success of a large renovation.
This guide isn't about creating magazine-worthy spaces (though you might end up with one). It's about successfully managing one of the most complex, expensive, and emotionally charged projects you'll ever tackle. Whether you're rescuing a neglected Victorian or dragging a 1970s ranch into the 21st century, the principles remain the same: understand what you're getting into, prepare thoroughly, and surround yourself with the right people.
Let's start with the elephant in the room: money. The average whole-house renovation costs $48,600, but that number is about as useful as saying the average American eats 20 pounds of ice cream per year. It tells you nothing about your specific situation.
I've seen basic cosmetic updates completed for $17,700 and luxury gut renovations that topped $200,000. The $10 to $150 per square foot range contractors quote reflects this enormous variation. At the low end, you're painting walls and updating fixtures. At the high end, you're essentially building a new house inside an existing shell.
Here's where most people trip up: they budget for the renovation they want, not the renovation they need. Your 1950s ranch might look like it needs cosmetic updates, but what happens when you discover the electrical panel hasn't been updated since Eisenhower was president? Suddenly your kitchen refresh becomes a whole-house rewiring project.
Not all rooms are created equal in renovation land. Kitchens are the prima donnas—expect to spend $14,600 to $40,000 depending on your ambitions. They involve plumbing, electrical, ventilation, cabinetry, appliances, and finishes. Everything's interconnected, so changes ripple through the entire space.
Bathrooms run $6,700 to $28,000 each, and here's a secret contractors won't always volunteer: bathroom renovations uncover more surprises than any other room. Water damage, outdated plumbing, structural issues—it's all hiding behind those innocent-looking tiles.
Bedrooms and living rooms are the easy children, typically running $1,500 to $5,500 and $5,000 to $10,000 respectively. Unless you're moving walls or adding features like built-ins, these spaces are relatively straightforward.
The real wildcards are laundry rooms and basements. That $6,000 laundry room renovation can explode if you discover moisture problems, inadequate electrical service, or structural issues. Always investigate thoroughly before committing to basement renovations—water problems can turn your dream space into a nightmare.
I've watched too many friends get blindsided by expenses they never saw coming. Building permits in major cities can run $5,000 to $15,000 for comprehensive renovations. In New York City, factor in expediting fees if you want permits processed in reasonable timeframes.
Material costs have become a moving target. Building materials have increased 35.6% since 2020, according to the National Association of Home Builders. That beautiful quartz countertop you fell in love with during planning might cost 20% more by installation time.
Then there are the soft costs that add up quietly: temporary storage for your furniture, alternative living arrangements if your kitchen becomes uninhabitable, eating out because you can't cook at home, and the inevitable "while we're at it" additions that seem logical in the moment but wreck budgets.
Smart renovators build 25% contingency funds. Not 10%, not 15%—25%. This isn't pessimism, it's survival strategy based on thousands of real projects.
Unless you're sitting on a pile of cash, you'll need creative financing. Understanding your options prevents expensive mistakes and helps you structure payments strategically.
Most homeowners' best renovation financing tool is hiding in plain sight: their home equity. Home equity loans and HELOCs offer some of the lowest interest rates available because your house secures the loan.
A home equity loan gives you a lump sum with fixed payments—perfect if you have firm budgets and timelines. HELOCs work like credit cards secured by your home, letting you draw funds as needed. This flexibility helps during renovations where costs evolve as work progresses.
The catch? You need significant equity, and most lenders want you to maintain 15-20% equity after borrowing. If you bought recently or live in an area with declining values, this might not work.
Cash-out refinancing can make sense if current rates beat your existing mortgage rate and you need substantial renovation funds. You're essentially getting a new, larger mortgage and pocketing the difference.
Personal loans work for smaller projects under $50,000. They're unsecured, so no home equity required, but expect higher interest rates. The upside? Fast approval and no home-as-collateral risk.
Credit cards seem tempting for specific purchases, and some offer attractive promotional rates. Use them strategically for appliances or fixtures, but never finance entire renovations this way. The interest rates will eat you alive.
Government programs like FHA 203(k) loans let qualified buyers purchase homes and finance renovations in single mortgages. If you're buying a fixer-upper, investigate these options early.
Here's where most people get it backwards. They start with Pinterest boards and contractor calls instead of honest self-assessment. Before you touch a design magazine, figure out what problem you're solving.
Spend a week honestly observing how you use your space. Do you actually need that formal dining room, or would a larger kitchen island serve you better? Is the master bedroom suite worth sacrificing a guest room? Do you entertain large groups or prefer intimate gatherings?
I watched my neighbors gut their kitchen to create an entertainer's paradise, then realize they rarely have more than four people over for dinner. Meanwhile, their tiny bedrooms drive them crazy every morning as they bump into each other getting dressed. Understanding your actual lifestyle prevents expensive mistakes.
This decision affects every choice you'll make. Renovating for resale means thinking like a buyer, not an owner. Neutral colors, broad appeal, and proven layouts that attract maximum buyers. Kitchen and bathroom updates typically return 70-95% of investment when done with market appeal in mind.
Renovating your forever home? Go wild. Want a wine cellar? Do it. Need a recording studio? Build it. Personal satisfaction matters more than resale value when you're staying put.
But here's the nuance most miss: even forever homes eventually get sold. Balance personal preferences with decisions that won't actively repel future buyers. Express your personality through easily changeable elements while keeping major structural and finish decisions broadly appealing.
Contractors will quote timeframes of 3-6 months for whole-house renovations and this time assumes seamless project flow. A smooth project to completion never occurs. Planning and permits alone could take a minimum of 4-8 weeks to obtain. In large cities like New York with complicated permits on renovation projects, this can sometimes take months. Therefore start that planning in advance because you can't do anything meaningful without getting the proper paperwork in order.
As for demo, it is dramatic and fun but can occur quickly (1-2 weeks), the clean up and disposal of everything takes longer than the demo phase.
The next phase is structural work for your renovation's backbone: foundation repairs, wall modifications, and major system updates. For this, you should allow 2-4 weeks on average (longer for things you don't expect).
The following phase is systems installation: electrical, plumbing, HVAC. Each system needs to be coordinated between contractors and trades party lines. In the hands of well-run contractors, these trades will be well scheduled. Weather, material availability, and trades schedules will be in charge of this phase, budget 3- 5 weeks for systems installations.
The next phase, called interior build out, takes patience and can feel agonizing. There are many steps that will require precision and time to dry. Generally, drywall, flooring, cabinetry, and finish work represent the disjointed build out phase; costs usually run around 4-8 weeks for build out, avoid the urge to cut every corner- perfection requires time.
Finally, your project will include final details and finish, and closing the project. This should average 1-2 weeks assuming your contractor has strong project awareness and high responsiveness.
With 28% of homeowners struggling to find qualified contractors, this step determines your project's success more than budget or design decisions.
Personal referrals remain the gold standard. Friends, neighbors, and family members who've completed similar projects provide invaluable insights. But ask specific questions: How did they handle problems? Did they communicate clearly? Were they reliable about schedules?
Professional networks offer underutilized resources. Architects, designers, and material suppliers work with contractors daily and know who delivers quality work. Real estate agents see renovation results and hear client experiences—their recommendations carry weight.
Online platforms like Angie's List, HomeAdvisor, and Houzz provide contractor profiles and reviews, but read critically. Focus on how contractors handle problems rather than just positive feedback. Every project has challenges; what matters is how they're managed.
Trade association memberships indicate contractors who care about professional standards. Better Business Bureau affiliations and local builder association participation suggest commitment to ethical practices.
Get bids from at least three contractors, ideally five. This isn't just about price comparison—it's about understanding different approaches and identifying red flags.
During interviews, evaluate communication skills as much as technical competence. Can they explain complex issues clearly? Do they listen to your concerns? Are they punctual and prepared? These soft skills predict project success better than technical credentials.
Ask these essential questions:
Door-to-door solicitation is amateur hour. Professional contractors have full schedules and don't need to hunt for work by knocking on doors.
Requests for large upfront payments indicate cash flow problems. Legitimate contractors typically ask for 10-25% down, with payment schedules tied to project milestones.
Estimates significantly lower than others often mean corners will be cut on materials, labor, or code compliance. When something seems too good to be true, it usually is.
Lack of proper licensing or insurance creates legal and financial liability for you. Never work with uninsured contractors regardless of their rates.
Reluctance to provide references or proof of insurance suggests something to hide. Professional contractors proudly share their work and readily provide documentation.
Vague contracts or preferences for verbal agreements indicate either inexperience or intentional ambiguity that benefits them, not you.
Finding reliable contractors in New York's competitive market requires understanding which firms consistently deliver exceptional results. Here are ten companies that have earned outstanding reputations through quality work and professional service:
1. Sweeten
Sweeten disrupts the contractor vetting process with their tech platform which assesses contractors, and provides full project management. They vet for each project based upon background checks, license verification, and portfolio.They also provide an entirely fixed-price contract format, and insurance provided to the homeowner during the project.
2. MyHome Design + Remodeling
This full-service firm is capable of managing a project from first architectural design through to the final construction documents. By keeping licensed architects, talented designers and skilled craftsmen as in-house team members, their process is much more seamless. They manage high-end home renovation, often in historic homes. The city is very complicated, and they have the knowledge and expertise to navigate the systems and deliver high-end renovation projects.
3. Bolster
Bolster's entire philosophy is based on leveraging smart home technology in the renovation process. With their renovations having an automatic lighting system and smart climate control, and complex security or entertainment systems, they all become part of the seamless design of the ongoing build. As a part of the build process they pride themselves on sustaining building and designs that will define their finishes and project delivery.
4. Bauhouse NYC
This design-build firm is very creative and specializes in the residential transformation of former industrial space to be modernized while keeping many of the architectural history aspects of each space.They have both mastered and are known for loft conversion and fresh contemporary design.They excel and are both creative and collaborative in solving some of these very unique design problems that manifest in what they do.They are connected to City inspectors and departments, and are trustworthy and well respected in working towards solutions of City approval processes.
5. ASA Builders Group
ASA combines traditional craftsmanship with modern construction methods, and focusing solely on luxury residential projects across Manhattan and Brooklyn. They embrace the details and fine detail of custom millwork and high-end finishes. ASA is well recognized for their transparency in price structure, and communicating with clients along the journey of the project.
Fontan Architecture
This integrated firm offers both architectural services and construction management so you get to see exactly what your vision intended. Their specialization in historic preservation makes them the best fit for landmark buildings and period restorations, and the range of service eliminates the potential to encounter coordination problems between the design and building process.
7. Brooklyn Renovation Company
This firm focuses on Brooklyn brownstones and historic properties and knows the nuances that come with renovating a century old building. Their understanding of historic preservation through a local lens, paired with their relationships with specialty suppliers who understand how to source period-appropriate materials make them essential for authentic restorations.
8. Renovation Sells
This firm focuses on renovations designed specifically to elevate the value of a property, working in tandem with real estate professionals and investors. Renovation Sells examines market-driven decisions as it relates to design, and quick project turnaround time makes them a top pick for homeowners preparing to sell, or investors flipping property.
9. Pristine Renovations
Pristine Renovations does an incredible job at maximizing purpose in large-scale architecture in the shape of small New York apartments and condos by leveraging resourceful design and space-saving solutions. Their backing of logistical planning in small-space living makes them popular among Manhattan apartment dwellers.
10. Knockout Renovation
Knockout Renovation celebrates twenty plus years of transforming homes in New York City, helping build an amazing reputation as a reliable contractor with skilled craft people to deliver everything for the home all under one roof. Their warranty program is commendable, and they utilize strong subcontractors to consistently produce a great finish on every type of project.
There are key factors to consider when vetting contractors:
It matters the size and complexity of the project, as some firms excel at large, complex projects while others leverage an efficient and quick turnaround for smaller renovations. Review firm portfolios to cement alignment on aesthetics!©.Assess communication styles during the initial consultations. Keep timeline and availability top of mind since established firms will busier with longer timelines and they are already better at scheduling. Get quotes from multiple firms and get the details of each estimate to acquire knowledge of the pricing fluctuations and what included on each firm's proposal.
New York City has a regulatory environment that can make it seem difficult to navigate the permits, but the right permits will save you protecting your investment and making sure you are safe.
In New York City, the Department of Buildings oversees most construction permits and there are specific agencies for the electrical and plumbing work. Most major renovations require the ALT-2 permit for a significant alteration, electrical permits for changing a system, plumbing permits for fixture changes, and mechanical permits for HVAC modifications.
The expectations of project timelines vary dramatically. Simple permitting a project will likely take from 2-4 weeks from point of submission to response, but more complex projects can take anywhere from 2-6 months or longer to have a response to your application. If your project is in a landmark building, a 2-6 month processing time is not uncommon, so be aware of your timeline.
Professional expeditors will move through the NYC bureaucracy much quicker than most contractors. Expeditors will increase the cost of the project but they can also save you time and money by preventing mistakes in permit applications. If the project is complex or you are in a tight timeline, expeditors are valuable tools.
Even if you have the perfect contractors, renovations need homeowners to be active participants in their project. You need to take charge of the project management and quality control.
Develop some communication plan from the first day.Weekly progress meetings allow for early identification of potential problems, and daily check-ins during important construction phases help to prevent small issues from turning into major setbacks.
Documentation is important for maintaining warranties, insurance claims, and having information for the future. Take pictures of the work as it progresses, keep a written record of every change, and keep all your receipts for materials and labor.
Do not wait until the end of the project to determine quality. Schedule inspections at key stages: A rough-in inspection to verify anything electrical, plumbing or HVAC is installed correctly before the walls finish closing up; a framing inspection to verify any structural alterations are what was proposed to the plans and any local building codes; A pre-finish at the ensure to cover off any issues before the final paint and installing the fixtures; the final inspection to hand the builder a detailed punch list prior to notifying for final payment.
If you will be living in the home through the renovation, set up zones that are construction free for your sleeping quarters, basic cooking, and bathroom. Consider the use of high-quality air purifying equipment to control daily dust. When essential services are temporarily not available, think of alternative arrangements.
Consider creating temporary kitchen space with the essentials. You may want to consider using rented storage units for items of furniture, and contents that are at risk of damage. Try to establish a daily routine around the construction schedule this may be difficult, but most contractors work Monday to Friday 7 AM to 5 PM.
There are good renovation decisions and personal choices that can be made that will collectively result in homes that work for your family and protect your financial investment.
There are specific improvements that historically have a good return on investment. Kitchen improvements have the best average returns of the projects studied, some kitchen remodels will recoup approximately 95% of the investment and major renovations have an average return of 49%. To get a good return on kitchen improvements consider where the money will have the greatest impact (such as appliances, countertops and storage).
Bathroom improvements also will add to the enjoyment during daily living and can improve resale value. When working in bathrooms it might be worthwhile to focus on the fixtures, lighting and ventilation. Energy efficiency improvements can improve operating costs and attract future environmentally conscious buyers to your home. Curb appeal improvements (such as siding and roofing, or even new entry doors) will not only make great impressions, they can also provide good returns.
When incorporating your personal taste, use quality mixing products with neutral backgrounds, and let your taste shine through with easy to change products, such as paint colors or the optional light fixtures, or accessories. Some of the elements that have universal appeal are hardwood floors, neutral wall colours, updated systems, energy efficient windows, modern aesthetic lighting, and high quality hardware. There will always be opportunities to show engagement but also save the personal expression for accent colours on the walls, decorative/changeable lighting, cabinet hardware, backsplash tiles, and outside landscape design.
Modern renovators are putting more smart technology, and in some cases sustainable technology, into homes that ultimately enhance daily lives and value for a long time.
It is less expensive to put wiring infrastructure in place during the rough-in when the walls are open. Check with your technology provider for compatibility with TV's, radio, wifi, and other services and products. Install Cat6 cable throughout the house; pre-wire for interior/exterior security cameras; pre-wire for smart locks at doors; plan climate control zone locations; install smart, switches and dimmers throughout; pre-wiring for planned audio, and entertainment; and plan for future wiring for a solar array.
Energy efficiency improvements typically qualify for rebates, and tax incentives when available, while providing overall lower operating costs in general. Think about insulating your home better, high performance windows, allow for, or have a new efficient HVAC system (or ask for an efficient HVAC system), water conservation, plan solar in the future.
There is no substitute for learning from other people’s mistakes. It can save you time, money, and stress.
All renovation projects have a tendency to go beyond the scope of the original plan. Maintaining control of scope creep should be managed through recordkeeping for all decisions, using proper change order procedures, being aware of what changes mean in dollars and timelines before you agree to them and remaining committed to the goals and priorities stated in the first place.
Many delays in renovation projects are due to the unavailability of materials. Think ahead and order items custom made for your renovation in advance. For example, custom millwork typically has an 8-12 week lead time, specialty appliances (6-10 weeks), natural stone countertops (4-6 weeks), custom lighting fixtures (6-8 weeks), and special orders (3-6 weeks).
Being informed of the current design trends helps to create a contemporary space, when it comes to making timeless choices about your renovation, you won’t be forced to renovate again 5 years from now when you’re already in a new renovation.
Current trends in renovations include open floor plans, larger kitchen islands, statement lighting, use of mixed materials, and dramatic backsplashes. The timeless choices include quality materials such as natural stone and hardwood, use of classic proportions, neutral colors, built-ins, and solid hardware.
Renovation safety includes more than wearing hard hats and work boots. Although older homes have certain hazards that only professionals should deal with, there can be health implications involved.
Homes constructed before 1978 will probably contain lead paint, which may become a hazard when disrupted or removed during your renovation project. There are serious health implications from lead dust that are particularly hazardous to children. Never attempt to perform lead paint removal by yourself, always hire certified professionals who will safely follow the rules set by the EPA for lead containment and disposal.
Asbestos is another potentially hazardous material encountered in homes built before 1980 and can be present as insulation, linoleum or vinyl flooring, pipe wrapping or even in some paint.Like lead, asbestos is only dangerous during disturbance, because it releases fibers that can cause lung disease and cancer. Prior to beginning work in any areas that could contain asbestos, you must have the area professionally tested to see if asbestos is present, and then the area must be professionally remediated if asbestos is found.
Construction dust is harmful to everyone, but is particularly risky to family members with asthma or allergies. Spend the money on good quality HEPA air purifiers and leave them running every day while the renovation is in progress. Seal off the construction area with plastic sheeting to stop the dust from spreading into your home. It is also important that any HVAC system you have should include upgraded filtration when you're undergoing a renovation.
Air quality is a serious concern when you're using paint, stains, or adhesives, and in some cases, flooring products that contain volatile organic compounds (VOCs). Apply oil-based paints, stains, and adhesives in well-ventilated areas, and in some cases you'll need to ensure adequate ventilation when you're laying flooring. When appropriate, open windows, run exhaust fans, or rent a specialized air-circulating unit that can be employed in construction areas that do not have adequate ventilation.
To survive a whole-house renovation while continuing to live in your home, you'll need to have a strong plan in place, plenty of patience, and practical expectations of what "normal life" will look like during the construction.
Designate one important bathroom that you will not let any of your contractors use or disturb—having a clean and functional space to retreat to every day is vital to sanity. Set up a temporary kitchen in some other unused room or in your garage with a microwave or coffee maker, a mini-fridge and basic utensil items. You'd be surprised what you can make happen without any complicated equipment.
Use a spare bedroom as your "quiet zone" at home. It's extremely difficult to join video calls or the like with the ongoing noise of renovation taking place. Find the areas of your home that are furthest from where construction is now, or if you need space for interviews on calls or video, consider temporary office space for the time being.Managing Family Life While Renovating
Renovation disruptions can be more challenging for children than adults. Try to keep consistent routines when possible, because regular bedtimes, family meal times, and homework spaces provide some normalcy in the chaos of construction. Emphasize the excitement by involving children in appropriate age decisions, such as choosing paint colors for their own rooms.
Pets require special consideration in renovation projects. Animals experience stress from the sounds of construction, and each time a door opens, the potential for flight is increased. Consider boarding pets during very noisy renovations, or you may want to arrange doggy daycare for the dog while they are working. Lastly, put away all tools and materials that may be harmful if snooped on by a curious cat or dog account.
Potentially valuable items must be put away in secure storage as soon as renovations are scheduled to begin. Construction dust will find its way into every nook and cranny, and no one can promise that accidents will not happen; therefore, anything valuable that is not going to be used should be stored. If you can't store it “safely” in the house, rent climate-controlled storage for furniture, artwork, electronics, etc. that you cannot protect properly on-site.
For items that will remain in the house until construction is finished, it would be helpful to spend some money on quality plastic sheeting and tape. Inexpensive plastic is useless and will tear easily, and therefore only will provide nominal protection to your belongings. Sure, using quality protective materials will cost a little more, but professional quality materials are actually effective in sealing out dust and debris.
A renovation of a whole house will challenge relationships, patience, and mental health in equally unfamiliar ways that you will not recognize until later to properly assess. Understanding your emotional process throughout the experience enables you to establish realistic expectations and perspectives when you think you cannot weather another compromising moment.
Renovation and construction requires thousands of decisions, from major renovations to minor things like cabinet hardware finishes. Making these decisions repetitively, day after day will wear out even the best decision-maker. To ward off decision fatigue each day, try grouping similar decisions together to eliminate overlap and repetitiveness, rather than make every possible decision as if they were made during installation (decisions on “no-no” items which make bargains, such as fixtures and installation details).
Make clear decisions so you can have clarity on which “renovation” decisions matter most to you!Focus energy on those decisions and accept "good enough" on the less important decisions. Remembering, perfect is the enemy of done, and in reality, most people won't even know the difference between your first and third pick of light fixtures.
Renovating is stressful enough on its own, but it can take a toll on even the strongest relationships. Partners can have different priorities, level of risk tolerance, and communication style which can come out during the pressure filled renovation process. Talk about how you typically make decisions ahead of time—who gets the final say on what?How will you handle disagreements? What does the process look like for making a major decision versus a minor one?
Of course you can expect to have some arguments, and it is a good idea to have a plan about how you will keep these arguments under control. If you find you are all worked up over decisions you are making, then take a break and come back to it. Sometimes the best solution is to hold off on making decisions until you have both calmed down.
A contractor basically becomes a temporary member of your household during the renovation process. Inviting someone into your space warrants conversation about the right boundaries to avoid problems. You can discuss what access your contractor will need to your home, what hours they are planning to work each day, any off limits spaces for crews, etc. Some contractors will work on weekends or evenings, just decide whether that is what you want and are ok with.
Different contractors will have different styles of communication and settings. For instance, some contractors will provide daily updates where others will only provide weekly updates. Setting out expectations early is very helpful; if they are not agreed upon upfront, then you can edit and change as the process unfolds. The majority of problems we have are 99% due to a problem with each of our expectations and not necessarily a problem with the quality of the work being performed.
Financing a renovation is worth a deeper dive than normal because making the wrong choice can wind up costing you thousands of dollars in wasted interest payments or restricting the scope of your project.
A home equity loan typically has the lowest rate because the loan is secured by your home; rates are different in each local market, but a home equity loan will generally be 2-4 percentage points lower than an unsecured personal loan.On a $50,000 renovation, that difference is likely $1,000-2,000 a year in additional interest.
Credit cards seem convenient, but they often charge hefty rates: 18%-25% a year on average. You should only use credit cards for short term purchasing and turn around and pay them off to keep your payments, short t more manageable. Otherwise, credit cards should only be used for the promotional purchase periods with a 0% APR for large purchases like renovations and appliances.
Some renovation expenses qualify for tax credits and write offs. Federal tax credits exist for energy-efficient upgrades like windows, insulation and heating and cooling upgrades, refer to the current IRS guidelines and professionals pertaining to your phenomenon.
Home office space renovations may be classified as business expenses. If you converted a basement area or attic into a designated office for your home business, you may be able to claim some benefit of the renovation tax strategic advantage easily offsetting the renovations cost ongoing.
Planning renovations during certain seasons affect costs, availability of contractors and how the building will technically proceed. Understanding seasonality and their distinct characteristics when it comes to configuration various construction spaces helps to maximize timing and budgeting.
The most ideal time to start a renovation project is typically when the weather is warming up in the spring and cooling down in the fall. Spring and fall brings moderate temp, low humidity and topographical changes, as well as a lack of precipitation. Spring and fall, in general are often peak times for contractors so expect cost increase or minimum wait time before being able to hire a quality contractor for your next renovation.
Contractor services may be more accessible and cost competitive during the winter months because you have reduced contractor activity in your area. For exterior work, bad weather is where things get really tricky as it may impact soft-hold working in the elements as well as potential supply delays for materials to be available if the contract doesn't have schedule rotations or access to communicate heavy snow and ice loads. But, in the winter months typically people spend the most amount of time indoors subsequently, their indoor renovations including but not limited to kitchen and bathrooms are best scheduled in the winter altogether with their interior use of space on their variables of paying for the renovation.
Summer provides clients with long daylight hours and rich and predictable weather plus backlogs in trade tradesmen, designer and contractors being on vacation may all create some challenging delays caused by contractor caught up in house renovating difficulties.Moisture can result in damage to materials, and delays for drywall and HVAC projects. Plan for adverse weather delays and build flexibility into project schedules during the season of unpredictable humidity and moisture.
Extreme temperatures will impact material performance and also a worker's ability to perform. Some paint and adhesives have specific temperature ranges that are critical for their application. Cold weather will make it harder to do concrete or masonry work.
There are benefits to finishing renovations but on the other hand, more responsibilities that will require your attention for continued upkeep and maintenance.
You should create a file for all renovation work; it should contain both contractor and material warranties with any manufacturer guarantees. You may not only want the file for your records, some of these warranties will require regular maintenance to stay valid. An HVAC system may require at least an annual visit from a professional to maintain the warranty.
You should make note of paint colors, material specifications and suppliers used for future repairs or additions. If possible, take resolutions, of any connections made, this is particularly true for renovations involving walls and ceilings that will be masked by future build out (cabinets, furniture, artwork, etc...).
New finishes and systems require different maintenance than what you might be used to. Natural stone for your countertops may require periodic sealing, you will need a particular cleaning product for your hardwood floor, a more efficient HVAC will change filters more frequently.
You should schedule annual maintenance for mechanical systems as appropriate, an annual tune up for every HVAC system, electrical inspections to make sure any electrical equipment is maintained safely, make sure plumbing is operating well so that small issues do not develop into more expensive emergency situations.
As your renovations inch to completion, attention to detail is going to become essential if you are to realize the results that you envisioned.
From the original scope of work develop complete lists of items that may be important for you to correct ahead of final payment. Typical punch list items include touch up painting, adjust cabinets, align fixtures, clean floors, install hardware, and touch up caulking.
Final Inspections, Final Walkthroughs, and Final Documentation
Set up final walkthroughs with each of the contractors to review all of the work, and then to do the final payment. Pull together warranty information for all the appliances, systems, and materials. For instance, create a home maintenance binder to include equipment manuals, all of the contractor contact information, maintenance schedules, and material specifications.
Successful whole-house renovations create more than just updated spaces—they reframe the way you experience your home every day. From a more functional space, to increased comfort, to easing the problems of daily life, the benefits of the renovation often compound over time.
Be sure to protect your renovation investments from the first day through proper maintenance and warranty management. Furthermore, by documenting and keeping track of any remaining priorities from your renovation, you can plan for the future and review and maintain contact with the trusted contractors you worked with when doing your renovations.
Although whole-house renovation is usually one of the largest investments that a homeowner makes, there is usually an equal or greater personal reward for the time, effort and financial costs. You can put your home on its best path to success by understanding the process, negotiating options, weighing your decisions meaningfully, and working with professionals capable of delivering a successful renovation.
Most importantly, every renovation is unique, presenting different opportunities and challenges. Successful renovations will stay flexible, communicate effectively, and trust the process. With effective planning, and realistic expectations, your whole-house renovation will result in renewed and enhanced value and satisfaction for many years.
The key to renovation success is not to avoid the problems that come with all renovations—they are going to happen. Rather, it is about preparing for the problems, and responding appropriately when they arise. With a plan, and some of this thinking that will go along with these guidelines, you are now ready to navigate your renovation process.
Whatever your home is, whether you’re renewing that little apartment you’ve outgrown, or transforming your new house that is larger or smaller (or not), your renovation approach will not change: standardize your planning, trust your people, get actively involved in munin mg the renovation, and control for your satisfaction; value retained for your sell; and value of your comfort, peace of mind, emotions (first showings are fun and empowering), to be captured throughout your and whenever you are envisioning the outcomes. You will be glad you spent the time and energy getting it right the first time, while there is an investment to be made.
Above all remember, your renovation is an odyssey, not a journey. First and foremost, enjoy the processes: learn from your challenges when they arise and enjoy them; and finally celebrate the journey and the milestones you will create along the way. You will have spent hours, months and money in the process of traveling through your renovation journey. Therefore your first walk through your new home will be memorable, not only as the home you will occupy; but as the memories and experiences created therein. You are not just price of property, you should be proud of all the new work you have achieved and have created a foundation for a happier and easier place to live for many years.